The goal for this assignment is for the Successful Supplier to provide engineering professional services to assist the City of Toronto in the preliminary design phase of Assignment 45-48 in the Basement Flooding Protection Program (BFPP). This assignment was identified as part of BFPP Class EA Study Area 45 and BFPP Class EA Study Area 4 Update and is located in Ward 5 (York South - Weston). Area 45 BF EA was completed in 2021 and a bundle of solutions were identified after study completion and have been named Assignment 45-48. The Assignment includes but is not limited to combined sewer separation, new storm sewers, storm sewer replacement, sanitary sewer replacement, stormwater storage, new outfall, and inlet control devices. · TOBids Document Number: 4373506891 | Type: RFP | Division(s): Toronto Water