To DoMedium priority

Parks — RFT 5253147241

Due May 26, 2026
Description

Only the Bids received from the Suppliers identified below shall be considered by the City as per RFSQ No. Doc4354732031: 1. 741127 Ontario Ltd. o/a Ferdom Construction 2. Hawkins Contracting Services Limited 3. 671860 Ontario Inc. o/a Somerville Construction 4. Rutherford Contracting Ltd. For Construction of Victoria Memorial Square The scope of work includes all labour, materials, equipment, and services required to complete the park revitalization project as described below: 1. Removal and disposal of existing hardscape elements, including unit paving, concrete paving, and rubberized surfacing. 2. Removal of existing park furnishings, including benches, waste receptacles, play elements, park signs, and playground fence. 3. Demolition of existing electrical system and park lighting. 4. Demolition of existing irrigation system. 5. In-place protection of existing heritage elements, including the War of 1812 Memorial, the tombstone memorial wall, Garrison Church corner stone, and Jane Jacobs chairs. 6. Protection of existing trees during construction. 7. Installation of new hardscape elements, including: o Unit paving, cobblestone paving, and concrete paving o Chipped granite fines surfaces o Granite block wall to define cemetery border o Rubberized surfacing for play area, and artificial turf for off-leash area o Natural stone or concrete curbs o Metal edging o Armourstone barrier along the west side of the play area 8. Planting bed preparation, sowing of meadow areas, sod installation, and planting of trees, shrubs, perennials, and plugs. 9. Installation of temporary fencing around all newly planted areas. 10. Supply and installation of new park furniture, including benches, picnic tables, café tables and chairs, seating blocks, bike rings, and park signage. 11. Supply and installation of new play equipment. 12. Installation of low fencing around planted areas and fencing around play area and off-leash area. 13. Installation and hook up of new drinking fountain to water supply. 14. Installation of subdrains and filtration trench for the off-leash area, and block stone wall. 15. Installation of new irrigation system. 16. Installation of new light poles, bollards, floodlight fixtures, linear LED fixtures, and candle lanterns. 17. Installation of new electrical system. Note: Some items noted in this scope of work are optional items; inclusion in contract to be confirmed at time of contract award. TOBids Document Number: 5253147241 | Type: RFT | Division(s): Parks, Forestry & Recreation | Wards: Ward 10 Spadina-Fort York

Money traced

No money traced to this project yet.