Disco Road Organics Processing Facility Tip Floor RehabilitationThe Works includes but is not limited to the following:a. Project startup including mobilization to the Site.b. Development, implementation, and maintenance of a Site-specific Health and Safety Plan, including provision of COR certification.c. Development and maintenance of a construction schedule outlining the dates for construction, for approval by the OWNER.d. Provision and maintenance of temporary facilities and controls.e. Demolition, Transportation and Disposal as per Section 02 41 19.13.f. Removal and assessment of condition of existing drainage sump covers, in conjunction with OWNER and CONTRACT ADMINISTRATOR.g. Cleaning of drainage sumps, assessment for any required repairs or re-lining.h. Repairs of sump cover frames, and sump covers, or new cover fabrication accordance with OWNER and CONTRACT ADMINISTRATOR directive, and replacement of sump covers in repaired frames.i. Removal of existing clean-out covers, and replacement with new clean-out covers.j. Supply and installation of wear indicators.k. Replacement and rehabilitation of the DROPF tip floor with high-performance concrete with or without resin-based materials as top coating. The tip floor rehabilitation scope of works are:1) Base scope: Topping System Replacement with high-performance concrete levelling and drainage sloping layer, with monolithically poured (thickened levelling layer) exposed concrete topping overlay (Full Area).a) This includes full area rehabilitation with the application of high-performance concrete with a full-depth topping thickness.2) Provisional scope: Topping System Replacement with high-performance concrete levelling and drainage sloping layer, with monolithically poured (thickened levelling layer) exposed concrete topping overlay across part of floor area, and resin topping overlay part of floor area.a) This includes full area rehabilitation with high-performance concrete similar to base scope. In addition, includes partial area rehabilitation of areas that are more prone to damage with the application of an exposed resin coating in a select area.3) Provisional scope: Topping System Replacement with high-performance concrete levelling and drainage sloping layer, and resin topping overlay across full floor area.a) This includes full area rehabilitation with high-performance concrete similar to base scope, with resin coating across entire tip floor area.Demobilization and closeout.Refer to Part 3 Tender Spec for more details TOBids Document Number: 4066982785 | Type: RFT | Division(s): Solid Waste Management Services