This contract includes in general, the following work: A pre-survey of all properties and CCTV inspection of existing sewers prior to commencement of forcemain installation. Installation of approximately 900m length of 100mm diameter sanitary forcemain by open cut along Bluffer's Park Road from the existing East Washroom Facility to an existing sanitary maintenance hole. Installation of an interconnection combination valve chamber and connection to existing pumped boat club forcemain. Testing and commissioning of the installed forcemain. Permanent Restoration TOBids Document Number: 4913561938 | Type: RFT | Division(s): Parks, Forestry & Recreation