This RFP is an invitation by the City of Toronto (the “City”) to prospective suppliers to submit Bids for Professional Engineering Services for Detail Design, Services during Construction and Post-Construction Bermondsey Transfer Station Various Repairs and Rehabilitations, as further described in Part 3 (Requirements for Deliverables) and Part 2 the Agreement (the "Project"). Detail design and site services during construction and post-construction for: • Installation of a New Metal Wall above the Existing Concrete Walls in the Leaf and Yard Waste Bunker. • Rehabilitation of Drainage in Haulage Lane Area. • Electrical Conduit Assessment and Rehabilitation for the Tipping Floor and the Levels Below. • Repair of the Tipping Floor Concrete Push Wall. • Southwest SSRM Bunker Tarp Repair. • Weigh Scale Repairs and Outbound Weigh Scale Deck Assessment. TOBids Document Number: 5281589055 | Type: RFP | Division(s): Solid Waste Management Services | Wards: Ward 16 Don Valley East
No money traced to this project yet.